So I've picked up two FMMs lately and am using one to control the RO/DI system to fill a 55-gallon reservoir. One Optical sensor is in the top, the other is at the 40-gallon mark. The top sensor is called RESOFF, the bottom sensor is RESON. I want the behavior to be: RO/DI starts up once the RESON sensor switches open and have it shut off when the RESOFF sensor switches closed. This way it'll run and fill about 15 gallons. Right now, my programming looks like the below and it is starting up the RO/DI system whenever the RESOFF sensor switches open.
Programming on a virtual outlet I created:
Fallback OFF
Set OFF
If RESOFF OPEN Then ON
If RESOFF CLOSED Then OFF
Programming on outlet to control solenoid valve:
Fallback OFF
Set OFF
If Output RSFLSTP = ON Then ON
If RESON OPEN Then ON
If RESOFF CLOSED Then OFF
Any Neptune help would be greatly appreciated!
Adam
Programming on a virtual outlet I created:
Fallback OFF
Set OFF
If RESOFF OPEN Then ON
If RESOFF CLOSED Then OFF
Programming on outlet to control solenoid valve:
Fallback OFF
Set OFF
If Output RSFLSTP = ON Then ON
If RESON OPEN Then ON
If RESOFF CLOSED Then OFF
Any Neptune help would be greatly appreciated!
Adam